Planning and financing combined heat and power projects

A combined heat and power (CHP) plant produces electricity and useful heat in the same process. Its economics depend on actual heat demand, operating hours and the electricity eligible for support. Before ordering, assess the heat offtake agreement, load profile, grid connection commitment and project timetable together. German CHP Act

Related topic: negotiating hydrogen supplies (German).

Purpose, definitions and scope

Section 1 addresses energy savings, climate and environmental protection and the transition to a greenhouse-gas-neutral supply based on renewables. Using the heat improves fuel utilisation. Thermal storage can separate the timing of electricity production from heat demand, allowing operation to respond to network conditions. Section 2 defines CHP installations, useful heat, high efficiency and heat networks. Eligibility is specific to each funding category. Section 1 · Section 2

Electricity premiums and the end-of-2026 deadlines

Section 6 governs premiums for new, modernised and retrofitted installations. Check fuel, high efficiency, displacement of existing CHP district heating, technical criteria and approval. Electricity used outside a public supply network is subject to additional conditions. Section 5 distinguishes statutory support from auction routes. Section 5 · Section 6

Section 6(1), point 1 offers three routes: continuous operation by 31 December 2026, a valid auction award, or a qualifying project commitment by year-end. For the third route, any required emissions-control permit must have been issued by the deadline. Where no such permit is required, a binding order for the plant, or the essential efficiency-determining components of a modernisation, can qualify. Continuous operation must then begin by the end of the fourth year following the permit or order. Keep dated evidence of the binding commitment and the installation it covers. Section 6(1), point 1

Calculate the relevant capacity bands and uses separately. Where section 7(1) applies to power fed into a public grid, for example, the first 50 kW attract 8 euro cents/kWh and the portion above 50 kW up to 100 kW attracts 6 cents/kWh. Other uses, auctions, bonuses and transitional rules can lead to different results. Section 8 limits support by full-load hours. Model eligible hours separately from physical running hours. Section 7 · Section 8 · Transitional rules

Networks, storage and innovative heat

New and expanded heat and cooling networks and newly built thermal and cold stores have separate support regimes. Sections 18–21 cover networks and sections 22–25 storage. For a heat store, section 22 governs eligibility and section 23 the amount. Provide separate evidence of investment costs, heat inputs, permits and commissioning. Networks · Heat storage · Amount

Innovative CHP systems can integrate renewable heat. Check the applicable auction route and, for innovative renewable heat, the conditions for the section 7a bonus. Record the technical and measurable contribution of each component in the offer. Section 5 · Innovative renewable heat bonus

Permitting, BAFA approval and operation

Whether an emissions-control permit and a formal or simplified procedure are required depends on the plant category and thresholds in the Fourth Federal Immission Control Ordinance. BAFA approval for support under section 10 is a separate decision. Sections 14 and 15 address measurement of CHP electricity and useful heat, notifications and supporting documents. Track authority procedures, notifications to the network operator and billing evidence in one project calendar. Permitting · BAFA approval · Metering · Notifications

Levies, renewable energy support and EU State aid

Section 10 EnFG governs the recovery of CHP funding costs through levies. Electricity-intensive businesses must meet the EnFG eligibility conditions for a cap. When comparing EEG and CHP support, identify the installation and the support already claimed. Section 1(3) KWKG excludes CHP installations receiving financial support under section 19 EEG from the scope of the CHP Act. Levies · Eligibility for caps · Section 1(3)

The EU Energy Efficiency Directive is relevant to high-efficiency cogeneration. State aid analysis turns on the design and financing of the particular measure. In T-409/21 the General Court annulled the Commission decision on the German arrangements under examination. On 9 July 2026 the Court of Justice dismissed the Commission’s appeal in C-242/24 P. Identify the statutory version and payment mechanism applicable to the project. Energy Efficiency Directive · General Court T-409/21 · Court of Justice C-242/24 P

Fuel transition, contracts and operating plans

For existing fossil-fuel schemes, model fuel and carbon costs alongside future heat demand. For hydrogen, biomethane and hybrid systems, assess availability, evidence of origin and conversion costs. Digital controls and storage can make operations more flexible. Reflect support assumptions, auction risk, metering and documentary obligations in finance, network use, heat supply and feed-in agreements. In a dispute over premiums or levies, begin with the approval decision, meter data and settlement statements.

Legislation and BAFA fees

Examples from our practice

A CHP unit supplies a production hall. We distinguish the plant’s own requirements from the useful heat delivered to the hall.

A heat customer reduces its shifts. We check the minimum offtake commitment and alternative uses for the heat.

Modernisation changes the plant’s capacity. We document the pre-existing equipment and the commissioning date.

The operator changes. We allocate the meter readings and outstanding payments by reference to the handover date.