A home solar project can involve a sale, installation work, a grid connection and a separate battery contract. If commissioning is delayed or equipment is defective, we identify the responsible contracting party and compare the agreed specification with what was delivered.
Which documents will help?
Start with the quotation, technical specifications, acceptance record and correspondence. Low annual generation can have several causes. We distinguish a contractual performance commitment from an estimate based on weather assumptions and from documented equipment faults.
Four practical examples
The promised backup power function is missing after installation. We compare the offer with the wiring design and set out the work needed to remedy the problem.
A battery repeatedly fails. We distinguish claims against the seller from any voluntary manufacturer’s warranty.
The installer issues a final invoice while connection documents are missing. We check the agreed deliverables and whether payment is due.
An inverter reports faults for months. We preserve operating records and identify outages attributable to the contracting party.